Title 13 BUILDINGS AND CONSTRUCTION
Chapter 13.12 FLOOD DAMAGE PREVENTION
13.12-4.010 General standards.
Development may not occur in the floodplain where alternative
locations exist due to the inherent hazards and risks involved. Before a permit
is issued, the applicant shall demonstrate that new structures cannot be located
out of the floodplain and that encroachments onto the floodplain are minimized.
In all areas of special flood hazard the following provisions are
required:
A. All new construction and substantial improvements shall be
anchored to prevent flotation, collapse, or lateral movement of the
structure;
B. All new construction and substantial improvements shall be
constructed with flood resistant materials and utility equipment resistant to
flood damage;
C. All new construction or substantial improvements shall be
constructed by methods and practices that minimize flood damages;
D. Electrical, ventilation, plumbing, heating and air
conditioning equipment (including ductwork), and other service facilities shall
be designed and/or located so as to prevent water from entering or accumulating
within the components during conditions of flooding. This requirement does not
preclude the installation of outdoor faucets for shower heads, sinks, hoses,
etc., as long as cut off devices and back flow devices are installed to prevent
contamination to the service components and thereby minimize any flood damages
to the building;
E. All new and replacement water supply systems shall be
designed to minimize or eliminate infiltration of floodwaters into the
system;
F. New and replacement sanitary sewage systems shall be
designed to minimize or eliminate infiltration of floodwaters into the systems
and discharges from the systems into floodwaters;
G. On-site waste disposal systems shall be located and
constructed to avoid impairment to them or contamination from them during
flooding; and,
H. Any alteration, repair, reconstruction, or improvement to
a structure which is in compliance with the provisions of this chapter, shall
meet the requirements of "new construction" as contained in this chapter. This
includes post-FIRM development and structures.
I. Non-Conforming Buildings or Uses. Non-conforming buildings
or uses may not be enlarged, replaced, or rebuilt unless such enlargement or
reconstruction is accomplished in conformance with the provisions of this
chapter. Provided, however, nothing in this chapter shall prevent the repair,
reconstruction, or replacement of an existing building or structure located
totally or partially within the floodway, provided that the bulk of the building
or structure below base flood elevation in the floodway is not increased and
provided that such repair, reconstruction, or replacement meets all of the other
requirements of this chapter.
J. American with Disabilities Act (ADA). A building must meet
the specific standards for floodplain construction outlined in Section
13.12-4.020, as well as any applicable ADA requirements. The ADA is not
justification for issuing a variance or otherwise waiving these requirements.
Also, the cost of improvements required to meet the ADA provisions shall be
included in the costs of the improvements for calculating substantial
improvement. (Ord. 01-O-06 § 1(part), 2001)